Project detail

Factory Project

media
media
A Factory Design by the Team, the Factory structure was proposed to be a G+2 structure. The method ofdesigning adopted was dynamic analysis as the structure falls in zone-4 as per seismic Considerations.

Are You Going to Implement Project?